Article Record · TNRD

Sign Structure Construction and Installation

available

Read at TNRD ↗

Metadata

  • SourceTNRD
  • Original URLhttps://tnrd.ca/sign-structure-construction-and-installation/
  • Canonical URLhttps://www.tnrd.ca/sign-structure-construction-and-installation/
  • Publish dateMay 20, 2026
  • First indexedMay 20, 2026 11:00 am PDT
  • Last checkedMay 20, 2026 11:15 am PDT
  • Current statusavailable (HTTP 200)
  • DescriptionClosing Date and Time: June 12, 2026, 4:00 pm The Thompson-Nicola Regional District is inviting quotes from qualified contractors for the construction and installation of nine timber sign structures at various locations within the TNRD. The term of this agreement is for a period of two years, commencing on June 26, 2026 and ending on […]

Assigned Topics

Status History

  • May 20, 2026 11:15 am PDT available · HTTP 200 · → https://www.tnrd.ca:443/sign-structure-construction-and-installation/

This page is a local metadata record. The article is not republished here — please follow the link above to read it at the original publisher.