Article Record · City of Kamloops
City of Kamloops
available
Read at City of Kamloops ↗Metadata
- SourceCity of Kamloops
- Original URLhttps://kamloops.ca/our-community/news-events/news-releases/traffic-delays-expected-during-summit-connector-paving
- Canonical URLhttps://www.kamloops.ca/our-community/news-events/news-releases/traffic-delays-expected-during-summit-connector-paving
- Publish dateAug 5, 2026
- First indexedAug 5, 2026 11:00 am PDT
- Last checkedAug 5, 2026 11:15 am PDT
- Current statusavailable (HTTP 200)
- DescriptionMotorists are advised to plan ahead for temporary traffic delays as the City completes road rehabilitation work along the Summit Connector from Monday, August 10, to Friday, August 14, 2026. The work includes milling, surface preparation, paving, and line painting along the right (slow) lane of Summit Drive from Mission Flats Road to Guerin Creek Way, including the Summit Drive and Guerin Creek Way intersection. A small section of paving will also take place on the downhill hairpin section of Summit Drive.
Assigned Topics
Status History
- Aug 5, 2026 11:15 am PDT available · HTTP 200 · → https://www.kamloops.ca/our-community/news-events/news-releases/traffic-delays-expected-during-summit-connector-paving
This page is a local metadata record. The article is not republished here — please follow the link above to read it at the original publisher.