Article Record · KamloopsBCNow
BC Hydro expands fast-charge site at summit of Coquihalla Highway
available
Read at KamloopsBCNow ↗Metadata
- SourceKamloopsBCNow
- Original URLhttps://kamloopsbcnow.com/watercooler/news/news/BC_Interior/BC_Hydro_expands_fast_charge_site_at_summit_of_Coquihalla_Highway/
- Canonical URLhttps://www.kamloopsbcnow.com/watercooler/news/news/BC_Interior/BC_Hydro_expands_fast_charge_site_at_summit_of_Coquihalla_Highway/
- Publish dateJun 29, 2026
- First indexedJul 1, 2026 3:00 pm PDT
- Last checkedJul 1, 2026 3:15 pm PDT
- Current statusavailable (HTTP 200)
- DescriptionBC Hydro is celebrating the milestone of 900 public electric vehicle (EV) charging ports across British Columbia. The utility provider hit that.
Assigned Topics
Status History
- Jul 1, 2026 3:15 pm PDT available · HTTP 200 · → https://www.kamloopsbcnow.com/watercooler/news/news/BC_Interior/BC_Hydro_expands_fast_charge_site_at_summit_of_Coquihalla_Highway/
This page is a local metadata record. The article is not republished here — please follow the link above to read it at the original publisher.